| Name of Work
: |
Design & Construction of
ROB in lieu of L.C.No. 179 - C on Bharuch
Dahej state highway on Build Operate and Transfer
basis. |
| |
| Client : |
Superintending Engineer Vadodara (R&B)
Circle, VADODARA |
| |
| Cost of Work : |
Rs. 55 Millions |
| |
| Year of Completion : |
February 1999 |
| |
|
| Description of Work : |
Design and construction of Road over Bridge
(1000 Meters including approaches) under
BOT Scheme was consisting of :
Foundation : Pile Foundation and Open
Foundation
Substructure : RCC Circular Pier
Superstructure : PSC Girders ( 2 x
22 m) and RCC Spans (2 x 27 m)
Approaches : 1 Km. Approach of Earthen
Bank |
|
| |
|
| |
|
|
|
| |
|
|
Approach Road towards
Dahej Side |
|
Road
Over Bridge connecting Bharuch & Dahej
State Highway |
| |
|
|
|
|
|
| |
|
|
Road Over Bridge across
Ahmedabad – Mumbai Main Line of
Western Railway |
|
Another
View of ROB on BOT Basis |
|
|
|
|
| |
|
| |
| Remarks
: |
- The prestigious first project of Government
of Gujarat was completed in a record time
of 13 months against allotted times of 22 months.
- The intricate bridge work over electrified
track (Ahmedabad – Mumbai line) was completed
with minimum interference to on going Rail traffic.
- Strict quality assurance and quality control
parameters were used during bridge work, earth
work and road work of this BOT project.
- The riding quality of the bridge was appreciated
by road users and saving in time
|
|