| Name of Work
: |
Design and Construction of six
lane ROB in lieu of L.C. No. 4A on Kalol Katosan
MG Railway on Ahmedabad Mehsana Road Project.
(in JV) |
| |
| Client : |
Ahmedabad - Mehsana Toll Road Co. Ltd.,
Ahmedabad. |
| |
| Cost of Work : |
Rs. 124.00 Millions |
| |
| Year of Completion : |
September 2002 |
| |
|
| Description of Work : |
The Road Over Bridge (total length 1
Kms.) was consisting of :
Foundation : 1000 mm dia RCC Cast-in-Situ
Bored Piles / Open Foundation, maximum depth
of boring about 20 metres, (total 20 nos.).
Substructure : RCC
Superstructure : RCC (1 x 13.42 m
) & PSC (1 x 19.17 + 1 x 23.27 m)
Approach Bank : Reinforced Earth
(2500 Sqm.)
|
|
| |
|
| |
|
|
| |
Staging for Railway
Span
|
Road work is in action |
| |
|
|
| |
Asphalting layer work
under process.
|
PSC Beam concreting
in action with Concrete Pump
|
| |
|
|
| |
View of ROB
|
Reinforced Earth approach
|
|
| |
|
| |
| Remarks
: |
- ROB was constructed at the location of existing
level crossing. The site falls in the busiest
highway of Ahmedabad - Mehsana.
- The site of work was not continuously available
due to limited space.
- Superstructure work consisting of continuously
RCC solid slab was carried out over Railway
Track by providing special staging arrangement
and conventional staging was adopted for spans
away from Railway Track.
- The work close to Railway Track has to be
done with utmost safety.
- The work involved intricacy of skew bridge.
(Angle of skew being 55°)
- Reinforced earth work was carried out using
precast facia panels and GI strips.
|
|