| Name of Work
: |
Construction of 2 two lane bridge on Surat Bardoli Road at Aai Mata junction, Surat. |
| |
| Client : |
Surat Municipal Corporation, Surat. |
| |
| Cost of Work : |
Rs.428 Million. |
| |
| Year of Completion : |
Work in Progress |
| |
|
| Description of Work : |
Two nos. of two lane flyover bridges (total length 720.53 and width 8.4 m of each flyover) is consisting of
Foundation : |
1200 mm dia pile |
Substructure : |
RCC Pier and Pier Cap |
Superstructure : |
18 x 20 m + 2 x 45 m (Pretensioned Precast I Girders & PSC Box) |
Approaches : |
300 m long R.E.structure. |
|
|
| |
|
| |
 |
 |
| |
Conventional Routine Load Test on Pile
|
Pier and Pier Cap |
| |
 |
 |
| |
Casting of Precast Pretensioned I Girder at casting yard |
Prestressing of Precast I Girder at casting yard |
| |
|
 |
 |
| |
Lifting and launching of Precast Pretensioned I Girder in position using two Crawler Cranes |
| |
|
 |
 |
| |
|
| Casting of PSC Box Girder |
Erection of RE Panel |
| |
|
|
| |
|
| |
| Remarks
: |
- The foundation of RCC bored piles (about 20 m long) were executed using MAIT HR 180 Hydraulic Rig. 144 nos. of Pretensioned Precast I Girders were cast in casting bed and launched them in position with the help of Crane. The 45 m box girders were cast in situ.
- The stipulated construction period is 18 months. It is expected to complete the work before schedule.
|
|