Name of Work : Construction of 2 two lane Road over Bridge between Sachin and Bhestan at Surat.
 
Client :

Surat Urban Development Authority.

 
Cost of Work : Rs.166 Million.
 
Year of Completion : Work in Progress
 
Description of Work :

Two lane ROB (total length 731 and width 10.2 m) is consisting of

Foundation :

1000 mm dia pile foundation

Substructure :

RCC Pile Cap

Superstructure :

7 x 20 m + (Railway portion 1 x 28 + 1 x 31 + 1 x 10.347 + 1 x 9.653 + 1 x 20 m) RCC T Beam with deck slab and wearing coat.

Approaches :

476 m RE Structure.

 
 
Lowering of reinforcement cage in pile bore. Integrity Testing of pile.
 
Lowering of reinforcement cage in pile bore.
Integrity Testing of pile.
 
Concreting of pile cap.  
 
Concreting of pile cap.
 