| Name of Work
: |
Construction of 2 two lane Road over Bridge between Sachin and Bhestan at Surat. |
| |
| Client : |
Surat Urban Development Authority. |
| |
| Cost of Work : |
Rs.166 Million. |
| |
| Year of Completion : |
Work in Progress |
| |
|
| Description of Work : |
Two lane ROB (total length 731 and width 10.2 m) is consisting of
Foundation : |
1000 mm dia pile foundation |
Substructure : |
RCC Pile Cap |
Superstructure : |
7 x 20 m + (Railway portion 1 x 28 + 1 x 31 + 1 x 10.347 + 1 x 9.653 + 1 x 20 m) RCC T Beam with deck slab and wearing coat. |
Approaches : |
476 m RE Structure. |
|