| Name of Work
: |
Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan. |
| |
| Client : |
Urban Improvement Trust, Kota |
| |
| Cost of Work : |
Rs.195.3 Million. |
| |
| Year of Completion : |
Work in Progress |
| |
|
| Description of Work : |
The ROB (total length 590 m incl. Approaches ) is consisting of:
Foundation :19 nos. of RCC Footing having depth 1.5 m (600 mm in hard rock)
Substructure : RCC Circular Pier (1800 mm dia)
Superstructure :Width of the bridge 17.2 m (without Footpath)
Span Arrangement :2 x 24 m (PSC I Beam) + 1 x 24 m (PSC Solid Slab) + 1 x 36 m (PSC Box Girder) + 13 x 18 m ( RCC Solid Slab) + 1 x 16 m ( RCC Solid Slab)
Approaches :RE Structure and Retaining Wall
Ramp :Having Width 11.2 m and 300 m length
|
|
| |
|
| |
 |
 |
| |
Retaining Wall Footing Rock Excavation
|
Rock Excavation Footing |
| |
 |
 |
| |
View of Substructure |
Staging arrangement for casting superstructure. |
| |
|
 |
|
| |
| RE Panel Casting Yard |
|
|
| |
|
| |
| Remarks
: |
- This ROB is to be constructed across one of the busiest level crossing. The portion of the bridge within Railway limit has to be constructed over Electric Overhead lines.
- The electric over head lines will be modified to ROB standard by Railway Department. Thereafter the girders will be cast at a height above bed block over a temporary staging. The temporary staging will be erected during traffic and electric blocks of Railway.
- The girders cast at a height of about 2 m above bed block shall be lowered in position by hydraulic jacks, observing utmost safety against the running train. This challenging job involving 16 girders will be completed in a period of about 90 days.
- A part of the approach is constructed with Reinforced Earth wall, Geogrid reinforcement has been used as Reinforcing Element.
|
|