Vijay M. Mistry Construction Pvt. Ltd.
 
 
 
Bridges-Flyovers  
 
Name of Work : Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan.
 
Client : Urban Improvement Trust, Kota
 
Cost of Work : Rs.195.3 Million.
 
Year of Completion : Work in Progress
 
Description of Work :

The ROB (total length 590 m incl. Approaches ) is consisting of:

Foundation :19 nos. of RCC Footing having depth 1.5 m (600 mm in hard rock)

Substructure : RCC Circular Pier (1800 mm dia)

Superstructure :Width of the bridge 17.2 m (without Footpath)

Span Arrangement :2 x 24 m (PSC I Beam) + 1 x 24 m (PSC Solid Slab) + 1 x 36 m (PSC Box Girder) + 13 x 18 m ( RCC Solid Slab) + 1 x 16 m ( RCC Solid Slab)

Approaches :RE Structure and Retaining Wall

Ramp :Having Width 11.2 m and 300 m length

 
 
Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan. Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan.
 
Retaining Wall Footing Rock Excavation
Rock Excavation Footing
 
Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan. Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan.
 
View of Substructure
Staging arrangement for casting superstructure.
   
Design and Construction of ROB on DCM Railway Crossing at Kota, Rajasthan.  
 
RE Panel Casting Yard  
 
 
Remarks :
  • This ROB is to be constructed across one of the busiest level crossing. The portion of the bridge within Railway limit has to be constructed over Electric Overhead lines.

  • The electric over head lines will be modified to ROB standard by Railway Department. Thereafter the girders will be cast at a height above bed block over a temporary staging. The temporary staging will be erected during traffic and electric blocks of Railway.

  • The girders cast at a height of about 2 m above bed block shall be lowered in position by hydraulic jacks, observing utmost safety against the running train. This challenging job involving 16 girders will be completed in a period of about 90 days.

  • A part of the approach is constructed with Reinforced Earth wall, Geogrid reinforcement has been used as Reinforcing Element.