| Name of Work
: |
Extension of R.C.C Jetty at
port Magdalla, SURAT. |
| |
| Client : |
The C. E. O. & V. C. (G. M. B.), Ahmedabad
|
| |
| Cost of Work : |
Rs. 13.9 Millions |
| |
| Year of Completion : |
December 1994 |
| |
|
| Description of Work : |
Construction of R.C.C Jetty (66 meters x
12.4 meters) was having foundations of Bored
Cast-in-Situ Piles of 800 mm diameter (Total
57 no. Average 25 m deep) and R.C.C. slab. |
|
| |
|
| |
|
|
| |
|
Piling Gantry for
G.M.B. Jetty
|
Positioning of Piling
Gantry truss for G.M.B. Jetty |
| |
|
|
|
| |
|
Piling
done with Piling Gantry |
Longitudinal
& Transverce R.C.C. beam
concreting in action |
|
| |
|
| |
| Remarks
: |
- This Project was completed ahead of Original
Time Limit. Some of the project highlights
were.
- Fender block and Bracing beams were cast under
tidal variation of 4 meters.
- Linear pitching in max. water depth of 9 meters
was carried out with help of 19 meters long
Gantry/Trusses and heavy duty Crane.
|
|