| Name of Work
: |
Protective measures for GAS
Pipeline across MAHI River at DABKA-GAJNA
section. |
| |
| Client : |
Engineer In-charge Gas Authority of India
Ltd., BARODA |
| |
| Cost of Work : |
Rs. 2 Millions |
| |
| Year of Completion : |
July 1993 |
| |
|
| Description of Work : |
Protective measures for GAS Pipeline across
MAHI River at DABKA-GAJNA section. |
|
| |
|
| |
|
|
| |
|
| |
| Remarks
: |
- GAIL's 2 numbers Gas Pipe Line across
River Mahi was exposed due to scouring in floods
and were on the verge of scrapping. GAIL had
entrusted us to do the Protective on emergency
basis. The same were carried out by us by constructing
Concrete Anchors with Bored Cast-in- Situ Pile
foundation and from these, Pipe were restrained
from movement by tying steel core wire rope
with and in-hously design clamping system, approved
by GAIL’s Consultant WAPCOS New Delhi.
|
|