| Name of Work
: |
Design & Construction of
Pile Foundation for 220 KV D/C Transmission
line tower in river Tapi near Hazira / Dumas
( Surat ). |
| |
| Client : |
The C. E. ( Civil ) G. E. B., BARODA |
| |
| Cost of Work : |
Rs. 34.87 Millions |
| |
| Year of Completion : |
May 1999 |
| |
|
| Description of Work : |
Construction of 220 KV D/C Transmission
line towers in river Tapti for Gujarat Electricity
Board, (Kabilpore - 396 424.) consisting of
six locations having 1250 mm dia bored cast-in-situ
piles (72 nos., depth more than 25 meters
and RCC pile cap and columns).Cost of project
was 34.87 Million Rupees , completed in 5
months period. |
|
| |
|
| |
|
|
| |
|
Transmission
Line Tower Foundation Location no 4 in
river Tapi near Hazira (Materials / Machineries
were transported to location with the
help of In housely made Pontoons /Barges
) |
| |
|
|
| |
|
Transmission
Line Tower Foundation Location no 5
( Entire Machineries were Transported
back to safe zone daily during Tidal effect
)
|
|
| |
|
| |
| Remarks
: |
- All six locations of Transmission tower foundations
were falling in river Tapti and required to
be taken under Tidal conditions. As such all
materials, man power and machineries had to
be transported by in housely made heavy duty
barges and specially modified Pontoons.
- Soil exploration and piling was carried out
with the help of Pontoon mounted rigs and constructing
steel platforms.
- Work completed on May,1999.
|
|