| Name of Work
: |
Construction of Pilling works
at Kandla Pump Station, Kandla. |
| |
| Client : |
Indian Oil Corporation Ltd., (Pipe Line
Dn), Kandla. |
| |
| Cost of Work : |
Rs. 3.82 Millions |
| |
| Year of Completion : |
December 1999 |
| |
|
| Description of Work : |
12 Nos. of Piles each of 800 mm Dia and
Length 20 M, Pile Cap (2 nos.) |
|
| |
|
| |
|
|
|
| |
|
|
Excavation of Pile Cap in action (all
safety measures have taken considering surrounding
running plant)
|
|
Pile Foundation for Booster
Pump House (besides running pumps) at I.O.C.L.
Plant, Kandla |
|
| |
|
| |
| Remarks
: |
The foundation for Booster was to
be provided in the existing Structures and close
to running Plant and Machinery. The bottom of Pile
Cap, being 4.5 M below Floor Level, the excavation
in collapsible slushy soil posed a number of problems
in retaining earth and safe guarding the existing
structures. But this problem was overcome by deploying
adequate shoring and shuttering and speedy execution
of the work by us. |
| |
|