| Name of Work
: |
Construction of Retaining wall
on both sides abutment of low level makai
bridge across River Tapi. |
| |
| Client : |
The C. E. (S.M.C.) SURAT |
| |
| Cost of Work : |
Rs. 6.7 Millions |
| |
| Year of Completion : |
April 1996 |
| |
|
| Description of Work : |
Construction of Retaining wall on both sides
abutment of low level Makai Bridge across
River Tapi is having Bored Cast-in-Situ piles
of 800 mm diameter (Total 70 nos 15 meters
deep) with R.C.C. pile cap & 6 meters
high R.C.C. Retaining wall. |